New system commissioning record

A record for commissioning new or refurbished water systems before handover: confirming flushing, disinfection, temperatures and any sampling so a system is not brought into use stagnant or contaminated.

This PDF is not tagged for assistive technology. Use this structured HTML page or the CSV as the accessible alternative.

Illustrative preview for New system commissioning record
DateSystem / areaWork stageFlushed (Y/N)Disinfected (Y/N)Sample taken (Y/N)Result / statusSign-off
2026-06-05New shower blockPre-handoverYYYAwaiting lab resultProject RP
2026-06-12New shower blockHandoverYYYSatisfactory; in useProject RP
        
        
        
        
        
        

Sample rows are illustrative. Download the PDF for a clean print-ready form, or the CSV to fill in digitally.

How to use it

  • Use when commissioning new, extended or refurbished systems: avoid leaving pipework filled and stagnant between installation and use.
  • Record thorough flushing, disinfection and, where the risk assessment indicates, sampling before handover, in line with HSG274 and water fittings/commissioning guidance.
  • Confirm hot and cold temperatures are achieved and obtain a disinfection certificate where one is produced.
  • Add the new assets to your asset register and written scheme of control, and sign off the system as fit to bring into use.

Background: Commissioning new water systems: preventing Legionella from day one