Take over a Legionella control programme as an FM team

Establish authority, recover the evidence baseline and triage gaps before accepting that an inherited programme is current or effective.

Prerequisites

Have these in place before treating the sequence as actionable.

Written authority and escalation route

Confirm who appoints, resources and supervises the Responsible Person and specialist providers.

Record roles and authority ›

Access to premises and inherited records

Request the assessment, schematic, written scheme, asset data, results, actions, training and contractor records.

Open the handover pack ›

Decision steps

Work through the questions in order. Follow current site instructions and competent advice where they set a different or more specific route.

  1. Confirm accountability before activity

    Ask: Who can authorise access, remediation, shutdown and specialist work?

    Escalate missing authority; an FM task list cannot repair an unclear dutyholder arrangement.

    Review the role boundaries ›
  2. Reconcile the system baseline

    Ask: Do the assessment, schematic and asset register match what is installed and occupied now?

    Record discrepancies, additions, decommissioned assets and access limitations without silently rewriting the assessment.

    Open the asset register ›
  3. Test evidence against the written scheme

    Ask: Can each control task be traced to a location, method, limit, frequency, owner and escalation action?

    Treat missing or unexplained records as a question for competent review, not automatic proof that the control failed.

    Use the evidence checklist ›
  4. Triage live failures and overdue actions

    Ask: Is there an adverse result, failed control, vulnerable population or unresolved high-risk defect?

    Separate immediate escalation from planned data-cleaning and record migration.

    Use the control-failure path ›
  5. Approve a time-bound takeover plan

    Ask: What must happen now, in the first month and after competent review?

    Name owners, dependencies and evidence of closure; do not backfill records for work that was not evidenced.

    Build the action plan ›