Shutdown and recommissioning record
A record for managing systems through closure or low-use periods and safely bringing them back into use: covering the action taken at shutdown and the flushing, disinfection and checks done before reopening.
This PDF is not tagged for assistive technology. Use this structured HTML page or the CSV as the accessible alternative.
| Date | System / area | Stage | Action taken | Flush/disinfect done | Temps/residual OK | Sample (Y/N) | Sign-off |
|---|---|---|---|---|---|---|---|
| 2026-04-01 | Whole building | Shutdown | Drained little-used areas; flushing plan set | N/A | N/A | N | FM |
| 2026-06-20 | Whole building | Recommission | Full flush + thermal disinfection | Y | Y | Y | FM |
Sample rows are illustrative. Download the PDF for a clean print-ready form, or the CSV to fill in digitally.
How to use it
- Record your plan for closed or low-use periods: either maintain flushing and temperatures or drain down systems to control stagnation.
- Before reopening, flush thoroughly, disinfect where the risk assessment indicates, and confirm temperatures and any disinfectant residuals.
- Sample before return to use where the risk assessment or duration of closure justifies it, and review the risk assessment after prolonged closure.
- Sign off each system as fit to reopen; reference HSG274 and current shutdown/reopening guidance rather than assumed periods.
Background: Managing Legionella during shutdowns and reopening
"Shutdown and recommissioning record (free template)." Legionella.io. https://legionella.io/templates/shutdown-recommissioning-record/
Free to reuse under CC BY 4.0: quote, adapt or republish with attribution and a link back to the original.